大跨度箱形桥顶进密布横梁线路加固体系设计 被引量:3

Design of Dense Transverse Beam Reinforcement System for Jacking Long-span Box Bridge
下载PDF
导出
摘要 目前在既有线不中断行车的情况下,顶进施工箱形桥线路加固的方法有军便梁(D型及B型)加固体系、以纵梁受力为主的纵横梁加固体系和以横梁受力为主的密布横梁加固体系。本文结合哈密铁路货车南环线1-16m箱形桥顶进施工密布横梁线路加固体系的设计,论述了上述三种加固方案的优劣性,并着重介绍了密布横梁加固体系的受力特征及受力分析。 The reinforcement methods of jacking and constructing the box bridge are the military beam(D-type and B-type) reinforcement system, the vertical transverse beam reinforcement system mainly of the longitudinal beam stress and the dense floor beam reinforcement system manly of transverse beam stress under the condition of the existing line without stopping the traffic now. Combined with the design of dense transverse beam reinforcement system for jacking and constructing the 1-16m box bridge in the south ring line of lorry in Hami Railway, the article discusses the superiority and inferiority of the above three reinforcement schemes, and focuses introduction on the stress character and stress analysis of dense transverse beam reinforcement system.
作者 杜卫军
出处 《城市道桥与防洪》 2013年第12期70-72,10,共3页 Urban Roads Bridges & Flood Control
关键词 大跨度箱形桥顶进 密布横梁加固体系 受力分析 jacking long-span box bridge,dense transverse beam reinforcement system,stress analysis
  • 相关文献

参考文献3

二级参考文献1

  • 1.铁路桥梁检定规范[S].铁道部,2002..

共引文献361

同被引文献7

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部