摘要 概述了压水堆核电站反应堆压力容器顶封头排气管(Reactor Vessel Head Vent,RVHV)焊接质量控制的关键要素,从坡口制备、组对、定位、焊接以及无损检测(Non-destructive Examination,NDE)等几方面对排气管以及支架的焊接质量控制措施进行了详细阐述,分析了受限空间焊接作业的安全防护措施,为国产化封头排气管提供制造经验。 The key elements for welding quality control of reactor vessel head vent in pressurized water reactor nuclear station were introduced, the welding quality control measures of vent and brackets were described in detail in terms of groove preparation, assembling, positioning, welding and non-destructive examination etc. , the safety protection measures for welding operation in restricted space were analyzed, and manufacturing experience was provided for localized head vent.
作者 李娟 吴宏亮
出处 《工程建设》 2013年第6期57-60,共4页 Engineering Construction
关键词 RVHV 焊接 质量控制 Reactor Vessel Head Vent (RVHV) welding quality control
  • 相关文献

参考文献6

  • 1林成格,郁组盛,欧阳予.非能动安全先进压水堆核电技术[M].北京:原子能出版社,2008.
  • 2ASME锅炉及压力容器规范第III卷,核电设备建造规则[S].北京:石油工业出版社,1998版.2000增补(中文版).
  • 3ASME锅炉及压力容器规范第IX卷,焊接和钎接评定标准[S].北京:石油工业出版社,1998版.2000增补(中文版).
  • 4ASME锅炉及压力容器规范第II卷,焊条、焊丝及填充金属[S].北京:石油工业出版社,1998版.2000增补(中文版).
  • 5郑日水.核电工程核岛焊接综合管理[J].电焊机,2009,39(8):1-5. 被引量:3
  • 6OHSAS18001-2007,职业健康安全管理体系-要求[S].