摘要
针对喷煤设备存在的问题,通过中修改造完善了设备和工艺,保证了设备安全运行和稳定生产,取得了预期的效果。
The pulverized coal injection equipment has some problems.The technical modification on the equipment and process is made in the intermediate maintenance to ensure the equipment in the safe and stable operation. This modification has achieved desired results.
出处
《冶金设备管理与维修》
2013年第6期41-42,共2页
Metallurgical Equipment Management and Maintenance
关键词
高炉
喷煤设备
改造
Blast furnace
pulverized coal injection equipment
modification