2Teale, R. The concept of specific energy in rock drilling [J]. Intl.J. Rock Mech.Mining Sci, 1965(2): 57-73.
3Lubinski,A. Proposal for future tests[M]. The petroleum engineer.Jan, 1958.
4Waughman, R.J., Kenner,etal. Real-time specific energy monitoring reveals drilling inefficiency and enhances the understanding of when to ppulIWorn PDC bits[C]. IADC/SPE PAPER No. 74520 presented at Annual Conference Dallas, 2002.