摘要
通过《水工挡土墙设计规范》和《建筑地基处理技术规范》有关条文规定的对比,对水工挡土墙采用水泥搅拌桩复合地基设计常见的几个问题进行了剖析,指出了设计人员易犯的几个错误,为今后水工挡土墙采用水泥搅拌桩复合地基设计提供参考。
Through comparison of items of Design Specification for Hydraulic Retaining Wall and Technical Code for Ground Treatment of Buildings, issues in design of composite ground of cement mixed pile applied by the hydraulic retaining wall are analyzed and mistakes by designer are pointed out. They provide reference to design of composite ground of cement mixed pile for the hydraulic retaining wall.
出处
《西北水电》
2013年第6期29-31,共3页
Northwest Hydropower
关键词
水工挡土墙
水泥搅拌桩
复合地基
hydraulic retaining wall
cement mixed pile
composite ground