自升式钻井平台新型拔桩挖泥器的研制 被引量:4

Research and Development of New Dredger for Pile-pulling Used in Jack-up Drilling Platform
下载PDF
导出
摘要 自升式钻井平台插桩入泥过深时,导致拔桩阻力增大,拔桩困难。文章介绍了一款针对该实际情况而研制的辅助拔桩挖泥器,用于拔桩之前挖出桩靴上部土体,通过减轻上部土重,达到了顺利拔桩的目的。文章分别从挖泥器方案设计、工作原理、现场试验等对其进行了论述。现场试验表明,该装置能够明显减小拔桩阻力,达到提高拔桩效率和进一步保证平台结构安全的目的。 In the case of deep pile-insertion, pile-pulling operation is difficult due to large soil resistance. A new kind of dredger for aiding pile-pulling operation has researched and developed to dig up the soil over the pile shoe so as to decrease the soil loads on the pile shoe. The design scheme and working principle of the new dredger are discussed. Its field test shows that this dredger can remarkably decrease pile-pulling resistance and reach the target of boosting pile-pulling efficiency and further ensuring platform safety.
作者 刘允杭 杨旬
出处 《石油工程建设》 2013年第6期38-40,8-9,共3页 Petroleum Engineering Construction
关键词 自升式钻井平台 拔桩 挖泥器 研制 jack-up drilling platform pile-pulling dredger research and development
  • 相关文献

参考文献3

二级参考文献9

  • 1隋吉林,张日向,韩丽华.基于ANSYS模拟潜坐结构吸附力[J].中国水运(下半月),2009,9(6):193-195. 被引量:4
  • 2李海瀛,石民惠.滞留海上二年之久的胜利六号钻井平台解脱移位[J].中国海洋平台,1992(5):228-228. 被引量:6
  • 3金广泉;金涛;陈晓红.底质对潜坐结构吸附力的试验研究[J]海军工程学院学报,1998(03):49-53.
  • 4Sahota B S,Wilson Q.The break-out behavior of suctionanchors embedded in submerged sands[].OffshoreTechnology Conference.1982
  • 5Purwana O A,Leung C F,Chow Y K.Influence of ba-se suction on extraction of jack-up spudcans[].Geotechnique.2005
  • 6Lee,H. J.Breakout of partially embedded objects from cohesive seafloor soils[].Proceeding of th offshore technology Conference.1973
  • 7Liam W D,Byrne P M.The Evaluation of theBreak-out Force for a Submerged Ocean Plat-form,1604-MS[]..1972
  • 8Roderick, G. L,Lubbard, A.Effect of object in-situ time on bottom breakout[].Proceeding of th offshore technology Conference.1975
  • 9韩丽华,姜萌,张日向.海洋结构物沉箱吸附力的试验模拟[J].港工技术,2009,46(6):43-45. 被引量:15

共引文献15

同被引文献18

引证文献4

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部