摘要 管道复合材料修复补强技术缺少统一的现场应用效果检验方法及评价指标体系,文章借鉴复合材料、管道外防腐层等检测方法,提出了一套简单易行的管道修复补强用复合材料检验方法及评价体系,其评价结果可以作为管道管理者优选现有修复补强材料及产品的依据。 There is a lack of uniform field testing method and evaluation indexes system in pipeline repair and reinforcement techniques using composite materials. Referring to the testing methods of composite materials, pipeline external anticorrosion layers and so on, this paper proposes the simple and feasible testing method and the evaluating system for field application. Its evaluation results are able to provide the basis of selecting existing repairing and reinforcing materials and products for pipeline managers.
出处 《石油工程建设》 2013年第6期56-59,10,共4页 Petroleum Engineering Construction
关键词 油气管道 修复补强技术 检测评价 纤维复合材料 pipeline repair and reinforcement techniques testing and evaluating composite material
  • 相关文献

参考文献5

二级参考文献25

  • 1Stephens D R, Kilinski T J. Field validation of composite repair of gas. transmission pipelines. GRI 98/0032
  • 2Milkovich Scott M,Barlo Thomas J. Literature review on the electrical and mechanical properties of glass-fiber composite materials when exposed to gas-transmission-pipeline environments. GRI 92/0253
  • 3Stephens D R,Kilinski T J. Field validation of composite repair of gas transmission pipelines. GRI 94/0139
  • 4Stephens Denny R. Summary of validation of Clock Spring(R) for permanent repair of pipeline corrosion defects. GRI 98/0227
  • 5Lindholm U S,Kuhlman C J,Stephens D R et al. Longterm reliability of gas pipeline repairs by reinforced composites. GRI 93/0453
  • 6Kuhlman Chris J,Lindholm U S,Stephens D et al. Longterm reliability of gas pipeline repairs by reinforced composites. GRI 95/0071
  • 7Permanent composite repair of gas transmission lines DOT regulatory process and results
  • 8AEA Technology Consulting:Temporary/Permanent PipeRepair-Guidelines,Offshore Technology Report,2001(038).
  • 9Dr J M Leeds and M G Catley:Large,Live Line Rehab Project Requires Detailed Planning Part 1,Pipe Line Industry,Feb.1994.
  • 10Kamal Morsi,Hesham Bayoumi and David Robson:Pipeline Rehab vs Replacement Depends on Condition,Service,Oil & Gas Journal,Sept.22,1997.

共引文献33

同被引文献57

引证文献7

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部