复杂气候条件下混凝土坝施工温度控制技术 被引量:3

Study on Temperature Control Technology for Concrete Dam Construction in Complex Climate
下载PDF
导出
摘要 地处北纬高寒地区的混凝土坝,施工过程需经受高温、严寒、干燥、蒸发量大等复杂气候的影响,因此温度控制要求高、难度大。对某高寒地区混凝土坝的温度应力控制计算方法、抗裂安全系数及温度控制标准确定、温度控制综合措施应用、早期与后期混凝土表面养护和保护等进行了研究。结果表明,混凝土坝施工最高温度和最大温差符合温控设计要求,仅在局部出现少量表面裂缝,未发现危害性较大的贯穿性裂缝。 Temperature control requirements for the concrete dam that located at latitude alpine region are strict and challenge, for a great climate change over the year .and the influence of complex climate such as high temperature, freezing cold, dry and too much evaporation, and so on. The calculation method of temperature stress control, safety factor of crack-resistance and the determination of temperature control criteria, the compre- hensive measures application of temperature control, early and post concrete surface conservation and protection and other aspects of technology were researched and applied in the actual project. The results show that the maximum temperature and the maximum temperature difference of concrete dam construction meet the design requirements with only a small amount of surface cracks appeared in partial area and without greater danger pene- trating cracks.
作者 吴伟民
出处 《人民黄河》 CAS 北大核心 2013年第12期109-111,114,共4页 Yellow River
关键词 复杂气候 混凝土坝 施工 温度控制 complex climate concrete dam construction temperature control
  • 相关文献

参考文献6

二级参考文献25

共引文献141

同被引文献11

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部