沙沱水电站闸墩预应力锚索施工 被引量:3

Floodgate Pillar Pre-stressed Anchor Construction in Shatuo Hydropower Station
下载PDF
导出
摘要 沙沱水电站闸墩锚索体系采用无隔离架和注浆管的新型结构,预应力锚索的施工质量关系到闸墩的结构安全。通过采用三级超张拉及主锚索二次灌浆等施工工艺,充分利用了锚固体系的预应力富余值,保证了锚索孔注浆的密实度。锚索测力计的观测数据表明,锚索体系的施工质量优良。 A novel structure without isolation frame and grouting pipe is adopted in Shatuo Hydropower Station Floodgate Pillar Anchor System. The construction quality of pre-stressed anchor is related to the structural safety of floodgate pillar. The pre-stress surplusage of the anchor system is fully utilized by adopting construction process of grade 3 super-tension, main anchor secondary grouting, etc., thereby ensuring the density of anchor hole grouting. Anchor dynamometer observational data shows that the construction quality of anchor system is excellent.
作者 范华伟
出处 《水利建设与管理》 2013年第12期13-15,共3页 Water Conservancy Construction and Management
关键词 闸墩 锚索 张拉 注浆 floodgate pier anchor tension grouting
  • 相关文献

参考文献1

共引文献2

同被引文献16

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部