摘要
本文主要介绍舟山市金塘木岙集装箱物流基地陆域形成项目吹填砂施工工艺,对其施工船舶的选择、水门的布设、吹砂管线的布置、施工技术要点、质量保证措施等进行论述,供类似工程参考。
The paper describes the hydraulic fill sand construction process of land formation project in Zhoushan Jintaugmuao Container Logistics Base. Its construction vessel selection, layout of water-gate, sand blowing pipeline layout, construction technique keys, quality assurance measures, etc. are discussed, thereby providing reference for similar projects.
出处
《水利建设与管理》
2013年第12期16-19,22,共5页
Water Conservancy Construction and Management
关键词
吹填
质量控制
吹砂
水门
管线
金塘木岙
hydraulic filling
quality control
sand blowing
water-gate
pipeline
Jintangmuao