本文介绍了恰甫其海水利枢纽联合进水口工程大高差混凝土施工过程中,在遇到入仓难、模板量大的困难时,采用的悬臂吊装模板、溜管缓冲装置,在混凝土输送、浇筑过程中减少了工作量,保质保量、高效地完成了混凝土浇筑,为类似工程施工提供借鉴。
Cantilever lifting template and chute buffer device adopted during difficult warehousing and large template quantity in the great height difference concrete construction process of Qiapuqihai Hydro Joint Intake Project was introduced in the paper. They are used for reducing the workload, ensuring quality and quantity, and efficiently completing concrete pouring in concrete delivery and pouring process, thereby providing reference for constructing similar projects.