摘要
本文从基础资料收集、除险加固设计方案选择、正常水位与洪水标准、建筑物除险加固处理措施等4个方面分析介绍了小型病险水库除险加固设计工作的思路、加固方案的确定方法、建筑物加固处理宜采取的措施,旨在与大家探讨分享设计经验,从而提高设计工作效率和设计成果质量。
The work concept of risk removal and reinforcement design in small dangerous dam, determination method of reinforcement program, and measures adopted in reinforcement treatment of buildings are analyzed and introduced in the paper from four aspects--basic data collection, risk removal and reinforcement design program selection, normal water level and flood standard, building risk removal and reinforcement treatment measures. The paper aims at discussing and sharing design experience with peers, thereby improving design efficiency and design achievement quality.
出处
《水利建设与管理》
2013年第12期62-64,共3页
Water Conservancy Construction and Management
关键词
小型水库
除险加固
设计
方案
措施
small reservoir
risk removal and reinforcement
design
program
measures