向家坝右岸电站500kV高压电缆安装与试验 被引量:4

Installation and Tests of 500 kV Cables in Xiangjiaba Right-bank Power Plant
下载PDF
导出
摘要 金沙江向家坝右岸电站500 kV高压电缆使用国产化电缆,是目前国内生产电压等级最高的高压电缆。高压电缆安装施工难度大、安装垂直度高、控制难度大、安全风险大。详细介绍了高压电缆敷设工艺及控制、电缆头制作及附件安装、电缆试验,并对电缆敷设中遇到的问题提出改进建议。电缆敷设工艺、质量、安全性较好,一次性通过高压试验,制造、安装质量满足设计要求。 The 500kV high-voltage cables in the right-bank power plant of Xiangjiaba Hydropower Station is made in China, and is currently the highest voltage level cable in China. The installation of cables is difficult because of large elevation difference, difficult to control and high security risk. The laying technologies and control of cable, the assembly of cable ends and accessories and the tests of cable are introduced herein in detail The suggestions for solving the issues encountered in installation are also presented. The process, quality and safety of cable laying is better, and the high vohage tests of cable are passed in the first task. The quality of cable manufacture and installation meets design requirements.
作者 周洪福
出处 《水力发电》 北大核心 2014年第1期43-45,52,共4页 Water Power
关键词 高压电缆 安装 试验 向家坝水电站 high voltage cable installation test Xiangjiaba Hydropower Station
  • 相关文献

同被引文献12

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部