向家坝水电站水轮发电机定子安装中采用了多项新技术、新工艺、新材料。在阐述定子下线技术的同时,给出了相关的工艺措施和技术参数,并提出了下线过程中出现的一些问题和相关处理方法。
A number of new technologies, processes and materials are used in stator installation of hydro-generators in Xiangjiaba Hydropower Station. The stator winding inserting technologies are introduced, and related processes and technical parameters are also presented. Some problems encountered in the installation are analyzed and their treatment ae also proposed.
出处
《水力发电》
北大核心
2014年第1期46-48,68,共4页
Water Power
关键词
水轮发电机
定子下线
工艺措施
技术参数
向家坝水电站
hydro-generator
stator winding inserting
process
technical parameters
Xiangjiaba Hydropower Station