摘要
武烈河12道橡胶坝建设中采取堵头式无搭接彩色橡胶坝;坝和基座采取楔块式锚固方式;基座采取了深浅槽设计;计算机控制坝内压力,实现了自动化管理。但由于武烈河上游土壤侵蚀较严重,每年发生季节性洪水,造成河道淤积,需要采取多种措施加强对橡胶坝的保护。
Having built 12 rubber dams in the Wuliehe River of Chengde, it is not to join the colored rubber dam after adopting the hair style of stopping up that it designs advantage one. Second, dam and base take wedge pieces of type anchor firm way. Third, base take depth trough design, it is apt to arrange the sand; Fourth, the computer controls the pres- sure in the dam , has realized automatic management, it is relatively normal to run for many years. But because visit the soil and corrode heavier on the military strong river, the seasonal flood takes place every year, cause the river to deposit, need to take many kinds of measures to strengthen and protect the rubber dam , could guarantee its safe operation.
出处
《水科学与工程技术》
2013年第6期57-59,共3页
Water Sciences and Engineering Technology
关键词
橡胶坝
土壤侵蚀治理
河道清淤
防寒措施
rubber dam
soil corroding and controlling
river and clear silt
winter protection measure