期刊文献+

The Role of Nuclear Regulators in Reviewing Population Growth Projections

The Role of Nuclear Regulators in Reviewing Population Growth Projections
下载PDF
导出
摘要 One of the roles of nuctear regulators is to review population projections calculated by applicants for populations lying in the vicinity of nuclear power plants. This paper examines methods of calculating rates of growth and thus calculating future population growth. This paper is concerned about regulators making sure that nuclear power plants are not located near densely populated centers and that population centers located near nuclear power plants do not become densely populated. In the case of El Dabaa city in the north coast of Egypt, south west of the nominated plant site, three rates of growth 1.5%, 2.5% and 3% were identified. The first is the current population growth rate of the city, the second is the average national growth rate and the third is the expected growth rate of the city when the nuclear power plant gets constructed and operated. In all three cases, this city is a population center and rules of distance from the nuclear power plant shall apply. Thus the further natural growth of this city should be controlled and directed away from the downwind of the plant.
出处 《Journal of Environmental Science and Engineering(A)》 2013年第7期447-452,共6页 环境科学与工程(A)
关键词 Nuclear regulators APPLICANT nuclear power plant population growth projections rates of growth population centers downwind direction. 人口增长 监管机构 人口预测 审查 经营城市 核电厂 自然增长 核电站
  • 相关文献

参考文献13

  • 1Interactive Map of Egypt [online], 2013, http://gosur.com/map/?gclid=CJiuh7ar97gCFYZb3 godT0 IADA#.
  • 2Google Maps [online], 2013, https://maps.google.com/.
  • 3Determination of exclusion area, low population zone, and population center distance [online], 2013, United States, Nuclear Regulatory Commission, Code of Federal Regulations, Part 100.11, http://www.nrc.gov/reading-rm/doc-collections/cfr/part 10 0/part 100-0011 .html.
  • 4Unstarred Question No. 1094 [online], 2013, Government of India, Department of Atomic Energy, Rajya Sabha,http ://dae.nic.in/writereaddata/rsus 1094_011211 .pdf.
  • 5Regulatory Requirements for Site Approval Permit of Nuclear Power Plants in Egypt, National Center for Nuclear Safety and Radiation Control Siting and Environment, Egyptian Atomic Energy Authority Arab Republic of Egypt, February 15, 2009.
  • 6Site Evaluation for Nuclear Installations, Safety Requirements No. NS-R-3, Safety Standard Series, International Atomic Energy Agency, 2003.
  • 7Windber Area School District Home Page [online], 2013, http://windberschools.org.
  • 8Statistical Year Book, Central Agency for Public Mobilization and Statistics, Arab Republic of Egypt, Cairo, 1986.
  • 9Statistical Year Book, Arab Republic of Egypt, Central Agency for Public Mobilization and Statistics, Cairo, 2010, p. 31.
  • 10Statistical Year Book, Arab Republic of Egypt, Central Agency for Public Mobilization and Statistics, Cairo, 2006, p. 31.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部