摘要
通过对许昌新区的地基土层分布情况进行分析,着重介绍了水泥粉煤灰碎石桩复合地基处理方法,将理论计算与现场静载荷试验数据进行了对比,得出了有价值的结论,为复合地基方案选择提供了依据。
Through the analysis on foundation soil distribution situation in Xuchang New District, emphatically introduced the process method of cement fly ash gravel pile composite foundation, compared the theoretical calculation to field static load test data, gained some valuable conclu sions, provided basis for the composite foundation scheme selection.
出处
《山西建筑》
2014年第4期76-77,共2页
Shanxi Architecture
关键词
高层建筑
复合地基
水泥粉煤灰碎石桩
high-rise building, composite foundation, cement fly ash gravel pile