摘要
通过深圳地铁11号线连续墙施工实践,从连续墙成槽辅助措施方案比选、外加剂选择、垂直度控制等方面详细介绍了深填海区高流塑性深厚淤泥地层地下连续墙成槽辅助措施施工技术,并对方案提出了优化建议。
Through the improvement on the construction practice of continuous wall in Shenzhen metro line No. 11, this paper introduced in detail the grooving auxiliary measures construction technology of underground continuous wall in deep reclamation area high current plastic silt stratum from continuous wall grooving auxiliary measures scheme selection, admixture selection, verticality control and other aspects, and put forward some optimization suggestions to scheme.
出处
《山西建筑》
2014年第5期58-61,共4页
Shanxi Architecture
关键词
高流塑性
淤泥地层
地下连续墙
成槽辅助
水泥搅拌桩
high current plastic, silt stratum, underground continuous wall, grooving auxiliary, cement mixing pile