摘要
通过计算分析,对距离车站较近的桥桩进行加固保护处理和不进行加固保护处理两种情况作出了计算结果的比较,说明车站基坑施工过程对桥桩有不可忽略的影响,通过注浆加固后能减小对桥桩的影响,加固保护措施是有效的。
In this paper, through calculation and analysis, reinforcement and protection of distance from the bus station near piles and two cases without reinforcement protection made a comparison of the numerical results, the station foundation pit construction process has a non negligible impact on the pile, the grouting can reduce the impact on the bridge, is the effective reinforcement protective measures.
出处
《山西建筑》
2014年第5期88-89,共2页
Shanxi Architecture
关键词
桥桩沉降
加固
保护
pile settlement, reinforcement, protection