摘要
对工程量清单下的投标报价,从投标报价的前期工作、投标报价、投标报价的审核等几方面进行了阐述,并提出了自己的一些看法,对提高工程项目的中标率具有一定现实意义。
This paper elaborated the bidding under BOQ from the preliminary work of bidding, bidding, bidding audit and other aspects, and proposed own some views, had certain realistic significance to improve the successful rate of engineering project.
出处
《山西建筑》
2014年第5期241-242,共2页
Shanxi Architecture