摘要
鉴于湖北汉江新集水电站是2009年《汉江干流综合规划报告》中推荐的汉江干流梯级之一,拟装机120 MW,结合当今灯泡贯流机组的发展水平,通过分析论证,初步选择了新集水电站水轮发电机组的主要参数。
Hubei Hanjiang Xinji Hydropower Station is one of the mainstream cascades recommended by《Hanjiang Ma- instream Comprehensive Planning Report》in 2009. The hydropower was intended to install 120 MW. According to the current development of bulb tubular unit, the main parameter of the unit were preliminary selected on the basis of analy- sis and demonstration.
出处
《水电与新能源》
2014年第1期8-11,共4页
Hydropower and New Energy
关键词
新集水电站
水轮机选型
灯泡贯流
额定水头
比转速
单位参数
Xinji Hydropower Station
turbine type selection
bulb tubular unit
rated head
specific speed
unit pa- rameter