摘要
详细介绍了拔贡水电站改扩建工程通风空调设计的总体情况;然后结合工程项目施工过程中发现的问题,进行分析和总结;根据工程项目的设计总结,提出一些经验供类似工程参考。
The paper makes a detailed introduction to the overall situation of ventilation and air conditioner design for the extension project of Bagong hydropower station; and a summary is given based on the analysis on the problems found in the construction process, meanwhile, some advices are put forward thereof, which can be well referenced by similar projects.
出处
《红水河》
2013年第6期19-21,共3页
Hongshui River
关键词
拔贡水电站改扩建工程
通风空调设计
Extension Project of Bagong Hydropower Station
ventilation and air conditioner design