摘要
介绍了龙江拔贡水电站改扩建工程电气一次设计的主要技术问题,从设计方案,设备选型、布置及结构特点等方面概述设计所采取的技术措施。
The paper makes an introduction to the main technical problems on primary electric design for the exten- sion project of Bagong hydropower station, and the adopted technical measures from design scheme aspect and from the aspects of selection, layout and structural features of equipments.
出处
《红水河》
2013年第6期22-25,共4页
Hongshui River
关键词
电气一次设计
拔贡水电站改扩建工程
primary electric design
Extension Project of Bagong Hydropower Station