拔贡水电站水轮发电机组导水机构尺寸大、重量大、安装调整精度要求高、安装时间短,因此导水机构拼装采用内配水环吊装位置的改变和导叶Y型密封圈的安装时机等方法,实现了在短工期内完成导水机构拼装。
Bagong hydropower station adopts a large and heavy distributor, whose assembly requires high precision and short duration. Therefore, the assembly of distributor is completed in a short period by changing the hoisting posi- tion of the inner water distributing ring and installing the wicket gate's Y-type sealing ring at the right time.
出处
《红水河》
2013年第6期77-79,共3页
Hongshui River
关键词
导水机构
导叶
控制环
拔贡水电站
distributor
wicket gate
gate operating ring
Bagong Hydropower Station