文章阐述了拔贡水电站改扩建工程施工门机合理布置方案,结合工程实际情况及特点,经精确验算,成功进行合理布置门机,并采取有效预防措施,为整个工程按期完成施工创造了良好前提条件,取得较好的经济效益。
The paper makes an introduction to the arrangement scheme for the construction gantry crane for the ex- tension project of Bagong hydropower station, the gantry crane is arranged successfully and reasonably by combining the actual situations and characteristics of the project with precious calculation and effective preventive measures, which not only creates favorable preconditions for timely completion of the project, but also obtains good economic benefits.