施工门机合理布置的实施 被引量:1

Implementation of Reasonable Arrangement of Construction Gantry Crane
下载PDF
导出
摘要 文章阐述了拔贡水电站改扩建工程施工门机合理布置方案,结合工程实际情况及特点,经精确验算,成功进行合理布置门机,并采取有效预防措施,为整个工程按期完成施工创造了良好前提条件,取得较好的经济效益。 The paper makes an introduction to the arrangement scheme for the construction gantry crane for the ex- tension project of Bagong hydropower station, the gantry crane is arranged successfully and reasonably by combining the actual situations and characteristics of the project with precious calculation and effective preventive measures, which not only creates favorable preconditions for timely completion of the project, but also obtains good economic benefits.
机构地区 广西水电工程局
出处 《红水河》 2013年第6期93-97,101,共6页 Hongshui River
关键词 施工门机 门机布置 拔贡水电站改扩建工程 construction gantry crane arrangement of gantry crane Extension Project of Bagong Hydropower Station