固结灌浆后岩体变形模量的确定方法——以高摩赞大坝枢纽工程为例 被引量:1

An Approach of Determining the Deformation Modulus of Rock Mass after Consolidation Grouting: Case Study of Gomal Zam Dam Multipurpose Project
下载PDF
导出
摘要 根据国内外工程经验,岩体变形模量的确定方法主要有现场试验和间接估算。固结灌浆后建基岩体的变形模量,往往难以进行大量的现场试验,而固结灌浆后的检查孔多会进行孔内声波测试。结合工程实例,在取得大量纵波测试数据和现场岩体变形模量试验资料基础上,拟合出纵波速度与岩体变形模量的相关关系,利用固结灌浆检查孔实测声波纵波速度,采用拟合的相关关系,对固结灌浆后岩体变形模量进行估算的方法,经济、便捷地取得灌浆后岩体的变形模量值。为工程设计复核提供了可靠的依据,可用于相似工程或试验资料不足工程灌浆岩体变形模量的确定。 The deformation modulus of rock mass is generally directly determined by field tests and indirectly estimated by relationships with other geo-parameters.For dam foundation rock mass,it is impractical to carry out sufficient field tests to verify the improvement of modulus after consolidation grouting.In this research,several relationships for estimating the value of grouted rock mass deformation modulus were proposed on the basis of longitudinal wave velocity,which can be economically and conveniently measured by geophysical prospecting.Gomal Zam Dam multipurpose project was taken as an example.This approach could be applied to determine the rock mass deformation modulus of similar projects or projects in lack of field data.
出处 《长江科学院院报》 CSCD 北大核心 2014年第1期58-60,76,共4页 Journal of Changjiang River Scientific Research Institute
关键词 变形模量 固结灌浆 建基岩体 变形试验 纵波速度 deformation modulus consolidation grouting dam foundation rockmass field deformation test longitudinal wave velocity
  • 相关文献

参考文献2

二级参考文献27

  • 1李建林,王乐华.节理岩体卸荷非线性力学特性研究[J].岩石力学与工程学报,2007,26(10):1968-1975. 被引量:32
  • 2郭志华,周创兵,周火明,盛谦,冷先伦.Macro mechanical parameters’ size effect of surrounding rock of Shuibuya project’s underground power station[J].Journal of Coal Science & Engineering(China),2005,11(1):9-12. 被引量:1
  • 3李云林.三峡工程坝基岩体力学参数选择分析[J].长江科学院院报,1996,13(3):45-49. 被引量:4
  • 4李夕兵,宫凤强.岩土力学参数概率分布的推断方法研究综述[J].长沙理工大学学报(自然科学版),2007,4(1):1-8. 被引量:25
  • 5徐光黎.岩体结构模型及应用[M].武汉:中国地质大学出版社.1993.
  • 6KAYABASI A,GOKCEOGLU C,ERCANOGLU M.Estimating the deformation modulus of rock masses:A comparative study[J].International Journal of Rock Mechanics & Mining Sciences,2003,(40):55-63.
  • 7ZHANG L Y,EINSTEIN H H.Using RQD to estimate the deformation modulus of rock masses[J].International Journal of Rock Mechanics & Mining Sciences,2004,(41):337-341.
  • 8CHUN B S,LEE Y J,SEO D D,et al.Correlation of deformation modulus by PMT with RMR and rock mass condition[J].Tunneling and Underground Space Technology,2006,(21):231-232.
  • 9BARTON N,LOSET F,LIEN R,et al.Application of the Q-system in design decisions concerning dimensions and appropriate support for underground installations[C]// International Conference of Subsurface Space,Rockstore.Stockholm:Sub-surface Space,1980.
  • 10CHRYSSANTHAKIS P,BARTON N.Predicting performance of the 62m span ice hockey cavern in Gjvik,Norway[C]//Proceedings of the International Conference Fractured and Jointed Rock Masses.CA:Lake Tahoe,1992.

共引文献49

同被引文献7

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部