期刊文献+

基于群组的序关系和价值工程的钢铁企业备件供应物流成本研究 被引量:1

Study on Logistics Cost in Steel-making Enterprise Spare Parts Supply Based on Intra-cluster Order Relationship and VE
下载PDF
导出
摘要 利用基于群组的序关系和价值工程理论从仓储、配送、装卸、运输、信息五个角度对钢铁企业备件供应物流成本控制进行了研究,通过计算成本系数、功能系数和价值系数,确定最优成本策略,为进一步推进钢铁企业备件供应物流成本成本控制和科学决策提供了一种新方法。 In this paper, using the intra-ctuster order relationship and the value engineering theory, we studied the logistics cost control of the steel-making enterprise's spart parts supply, and then by calculating the cost coefficient, functional coefficient, and value coefficient, determined the optimal cost strategy.
作者 聂小红
出处 《物流技术》 北大核心 2013年第12期383-385,共3页 Logistics Technology
基金 南钢有限责任公司资助课题"国家重点行业发展与价值需求研究"(2009-1-R-009)
关键词 序关系 价值工程 备件供应物流 order relationship value engineering spare parts supply logistics
  • 相关文献

参考文献6

二级参考文献11

共引文献21

同被引文献14

  • 1ARAGONI~S-BELTR,~N P, CHAPARRO-GONZ,~LEZ F, PASTOR- FERRANDO J P,et al. An ANP-based approach for the selection of photovoltaic solar power plant investment projects [ J ]. Renewable and Sustainable Energy Reviews,2010,14 ( 1 ) :249-264.
  • 2CHEN H H,KANG H Y,LEE A H I. Strategic selection of suitable projects for hybrid solar-wind power generation systems [ J ]. Renewable and Sustainable Energy Reviews,2010,14( 1 ) :413-421.
  • 3XIAO J,YAO Z,QU J, et al. Research on an optimal site selection model for desert photovoltaic power plants based on analytichierarchy process and geographic information system [ J 3. Journal of Renewable and Sustainable Energy, 2013,5 ( 2 ) :023132.
  • 4CARRION J A,ESTRELLA A E, DOLS F A, et al. Environmental decision-support systems for evaluating the carrying capacity of land areas: optimal site selection for grid-connected photovoltaic power plants[ J]. Renewable and Sustainable Energy Reviews, 2008, 12 (9): 2358-2380.
  • 5ZADEH L A. The concept of a linguistic variable and its application to approximate reasoning-I I J~. Information sciences, 1975,8(3 ) : 199 -249.
  • 6OPRICOVIC S, TZENG G H. Compromise solution by MCDM methods: a comparative analysis of VIKOR and TOPSIS [ J l- European Journal of Operational Research ,2004,156( 2 ) :445-455.
  • 7KAYA T, KAHRAMAN C. Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology:the case of Istanbul [ J ]. Energy,2010,35 ( 6 ) :2517-2527.
  • 8刘鸿雁,阎涛,王光远.基于AHP和VIKOR算法的评标方法研究[J].技术经济,2009,28(5):32-34. 被引量:14
  • 9杨杰,张琳.工程建设项目投资决策方法分析[J].山东省青年管理干部学院学报(青年工作论坛),2010(2):104-106. 被引量:12
  • 10邹建平,吴应宇.基于模糊TOPSIS方法的区域物流基础设施布局方案评价研究[J].东南大学学报(哲学社会科学版),2011,13(1):33-36. 被引量:12

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部