期刊文献+

国家电网项目运营后评估研究 被引量:6

Research on the Establishment of Post Evaluation System for the Operation Process of Power Grid Project
下载PDF
导出
摘要 通过实证调研分析方式建立起详细具体切实可用便于企业推广的电网项目运营过程后评估指标体系。根据上海、广州以及国家电网相关指导文件,通过调研访谈中国各地区企业有经验人士,建立初步的电网项目运营过程后评估指标体系,而后针对全国各地区电力企业中高层有经验人士发放调研问卷,根据问卷结果进行分析筛选最终得出基于知识管理的电网项目运营过程后评估指标体系,并利用AHP方法确定各指标的权重。 The paper establishes an elaborate evaluation system of the operation process of power grid project by the method of empirical study and analysis. The paper establishes a primary post evaluation system according to the guide files of Shanghai, Guangzhou and the investigation feedback of some experienced people working in the electric enterprises. Then, the paper builds power grid project post evaluation questionnaire and issues the questionnaire to the experienced managers and employees working in the electric companies all around China. To get the significance relationship between the criteria and the knowledge management, the paper does factor analysis according to the investigation result and builds the structural equation model to establish the post evaluation system for the operation process of power grid project based on the knowledge management. And finally the paper gets the weights by AHP .
出处 《科技管理研究》 CSSCI 北大核心 2014年第2期199-204,共6页 Science and Technology Management Research
基金 国家自然科学基金项目"关键链项目进度管理的柔性研究"(70802045)
关键词 电网项目 运营过程 后评估指标体系 因子分析 结构方程检验 power grid operation process post evaluation system factor analysis SEM
  • 相关文献

参考文献24

  • 1EHSANI A, FOTUNI M, ABBASPOUR A, et al. An Analytical Method for The Reliability Evaluation of Power Grid Systems [ C ]. IEEE Region 10 Annual International Conference, Proceedings/TEN- CON, 2007, 1 -7.
  • 2DUTTAGUPTA S S, CHANAN S. A Reliability Assessment Methodol- ogy for Distribution Systems with Distributed Generation [ C ]. IEEE Power Engineering Society General Meeting, 2006, 1 -7.
  • 3任震,万官泉,黄金凤,黄雯莹,高志华.电力系统可靠性原始参数的改进预测[J].电力系统自动化,2003,27(4):37-40. 被引量:38
  • 4李文沅,周家启,颜伟,谢开贵.基于可靠性的电力系统设备备用规划方法[J].中国电机工程学报,2006,26(15):7-11. 被引量:20
  • 5宋晓通,谭震宇.改进的发输电系统可靠性评估方法[J].四川电力技术,2007,30(1):19-21. 被引量:1
  • 6雷秀仁,任震,陈碧云,万官泉.电力系统可靠性评估的不确定性数学模型探讨[J].电力自动化设备,2005,25(11):1-4. 被引量:23
  • 7STAHLHUT J W, HEYDT G T, SHEBLE G. A Stochastic Evaluation of Available Transfer Capability [ J ]. Power Engineering Society Sum- mer Meeting, 2005, 3 (6) : 3055 -3061.
  • 8BAHBAH A, GIRGIS A. New Method For Generators' Angles and Velocities Prediction for Transient Stability Assessment of Multi - Ma- chine Power Systems Using Recurrent Artificial Neural Network [ J ]. IEEE Transactions on Power Systems, 2004, 19 (2) : 1015 - 1022.
  • 9ALBERT R, ALBERT I, NAKARADO G L. Structural Vulnerability of The North American Power Grid [ J]. Physical Review E, 2004, 2 (2): 1-4.
  • 10MING N I, MCCALLEY J D, VITTAL V, et al. Online risk - based security assessment [ J ]. IEEE Transactions on Power System, 2003, 18 (2): 258-265.

二级参考文献74

共引文献480

同被引文献20

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部