输变电工程前期设计与造价的管理

Research on initial feasibility for design and cost management of transmission and transformation project
下载PDF
导出
摘要 在优化建设方案、设计方案的基础上,在组织实施项目建设的各个阶段,采用项目法人责任制、招投标制、监理制及合同制,使得输变电工程项目建设管理工作规范化,在合理的范围和核定的造价限额内,以求最大效能地运用人力、物力、财力,取得良好的投资回报。 Based on the optimizing of development scheme and designing scheme, at different stages of project construction organization and implementation, this paper adopted project entity responsibility system, bidding system, supervision system and contract system to normalize construction management of transmission and transformation project. In a reasonable range and approved quota, the manpow- er, material resources and financial resources were applied in the most efficient possible way to acquire better return of investment.
作者 李应林
机构地区 遵义供电局
出处 《贵州电力技术》 2013年第12期51-52,46,共3页 Guizhou Electric Power Technology
关键词 输变电工程 可研设计 工程造价 影响因素 transmission and transformation project feasibility study design project cost influence factor
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部