摘要
输变电设备在安装竣工和验收后,投入运行时通常按照启动方案操作完成,以保证设备安全、顺利进入运行状态。文章阐述了330 kV变电站设备启动方案编写的一般内容和要求,并对启动过程中几个关键问题进行了探讨。
After the installation completion and acceptance of transmission and transformation equipment, it puts into operation in accordance with the start programme, to ensure the equipment safety, successfully enter the running state. The paper explains the start programme' s general content and requirements of 330 kV substation equipment, and discusses the key problems in the process of start.
出处
《青海电力》
2013年第4期8-11,共4页
Qinghai Electric Power
关键词
启动方案
变电站
编写
start progeamme
substation
compile