期刊文献+

一种新型投产前管道智能测径检测器 被引量:12

A new smart calibre detector for Pre-commissioning pipeline
原文传递
导出
摘要 传统的投产前管道测径方法存在检测周期长、人力物力消耗大、可靠性差等问题。为此,研发了一种新型投产前管道智能测径检测器,该设备的机械主体由筒体、皮碗、变形探头臂及里程轮组成,电气主体由记录仪、电池组、标记器及变形传感器组成。投产前管道智能测径检测器主要依靠空压机作为动力源,在不建立背压的管内环境下运行,并需解决不稳定的运行状态造成的检测数据丢失、信号失真等问题。现场实际应用结果表明:该装置能够在较短时间内快速发现、量化和定位站间管道存在的变形,从而大大缩短管道的施工工期,为管道验收提供科学依据。(图3,表1,参8)。 Traditional caliber method for Pre-commissioning pipeline has shortcomings such as long caliber period, high manpower and material resources consumption and low reliability. To solve this problem, a new smart calibre detector for Pre-commissioning pipeline has been developed. The main mechanical part of this device consists of cylinder, rubber cup, deformation probe ann and odometer wheels, while the main electric part is composed of recorder, battery array, marker and deformation sensor. This smart calibre detector, mainly using air compressor as power source and operating under the environment of non-back pressure in pipeline, has to overcome problems like loss of detection data and signal distortion caused by unsteady operation. The practical application in field shows that this device can quickly find out, quantify and locate the deformation points in pipe in a short time, and thus greatly reduce the construction period and provide a scientific basis to the pipeline's acceptance. (3 Figures, 1 Table, 8 References)
出处 《油气储运》 CAS 2014年第1期61-64,共4页 Oil & Gas Storage and Transportation
关键词 新建管道 变形 投产 智能测径 newly-built pipeline, deformation, commissioning, smart calibre
  • 相关文献

参考文献4

二级参考文献52

  • 1张团峰.关于非参数回归函数的逐点假设检验[J].西安石油学院学报,1996,11(6):50-53. 被引量:1
  • 2伍颖,张鹏,刘武,陈利琼,刘永红,韩爱真.影响含有凹痕管道运行寿命的因素研究[J].管道技术与设备,2006(4):8-10. 被引量:6
  • 3Cosham A, Hopkins P: The effect of dents in pipelines-- guidance in the pipeline defect assessment manual, International Journal of Pressure Vessels and Piping, 2004, 81.
  • 4Dawson S J : Emerging techniques for enhanced assessment and analysis of dents, Proceedings of IPC 2006 6th International Pipeline Conference, Calgary, Alberta, Canada, 2006.
  • 5ASME B31.8 --2003 Gas transmission and distribution piping systems.
  • 6Baker: Integrity management program dent study, Department of Transportation, Delivery Order DTRS56--02-- D--70036, 2004.
  • 7Rinehart A J: Effects of localized geometric imperfections on the stress behavior of pressurized cylindrical shells (PhD dissertation) ,Texas ARM University, 2003.
  • 8Rinehart A J, Keating P B: Length effects on fatigue behavior of longitudinal pipeline dents, Proc. of the 2002 International Pipeline Conference,ASME, Calgary, Alberta, Canada, 2002.
  • 9Bianea de Carvalho Pinheiro: Stress concentration factors of dented pipelines, Proceedings of IPC 2006 6th International Pipeline Conference, Calgary, Alberta, Canada, 2006.
  • 10Cosham A, Hopkins P: The pipeline defect assessment manual, Proceedings of IPC 2002 International Pipeline Conference, Calgary, Alberta, Canada, 2002.

共引文献86

同被引文献85

引证文献12

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部