连云港港旗台港区10万吨级散化泊位后方西围堤加固方案比选

Comparison and selection of reinforcement processing program about west breakwater behind Lianyungang Qitai port's 100 000-ton bulk berth
下载PDF
导出
摘要 连云港港旗台港区10万吨级散化泊位后方西围堤为在港区原防波堤的基础上经爆破挤淤抛石施工工艺拓宽形成,受形成条件限制,形成的堤身下部存在淤泥层,需进行加固处理。通过对不同加固处理方案的比较分析,确定了最终实施方案,节约了工程投资,满足工程施工和使用期安全稳定的要求。 The west breakwater behind Lianyungang Qitai port's 100 O00-ton bulk berth is formed on the basis of the original breakwater by blasting riprap construction process. Restricted by the formation conditions, the lower part of the breakwater is the silt layer which needs to be reinforced. Based on the comparative analysis of different reinforcement processing programs, we determine the final scheme which can not only reduce the project investment, but also meet the requirements of both construction and stability during construction.
出处 《水运工程》 北大核心 2014年第1期81-85,共5页 Port & Waterway Engineering
关键词 围堤 限制条件 加固处理 breakwater limiting condition reinforcement
  • 相关文献

参考文献7

  • 1中交第三航务工程勘察设计研究院有限公司.连云港港旗台港区10万吨级散化泊位西围堰外侧加固工程设计文件[R].上海:中交第三航务工程勘察设计研究院有限公司.2010.
  • 2江苏省水文地质工程地质勘察院.连云港港旗台港区10万吨级散化泊位西围堰外侧地质勘察报告[R].南京:江苏省水文地质工程地质勘察院,2009.
  • 3JTJ215-1998,港口工程荷载规范[S].
  • 4JTS206-1-2009,水运工程塑料排水板应用技术规程[S].
  • 5JTJ239-2005,水运工程土工合成材料应用技术规范[S].
  • 6JTJ298-1998,防波堤设计与施工规范[S].
  • 7JTJ 254-1998,港口工程桩基规范[S].

共引文献159

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部