西藏日江公路改建工程桥位上部覆盖2-4m厚的砂砾层。下部为砂岩的特点。介绍砂砾层中挖孔桩施工工艺。
There is a grit layer of 2-4m's thickness on the bridge location with sandstone under it of the reconstruction project of Rijiang highway in Tibet. The digging pile construction technology for grit layer is introduced.