摘要
主要介绍25 m箱梁预制过程中的施工工序、工艺,以及在施工过程中质量主要控制点和采取的技术措施。
This article mainly introduces the construction process, in the process of 25 meters box girder precast technology, as well as the quality of the main control points during the process of construction and technical measures.
关键词
箱梁
预制
技术
box girder
precast
technology