核电用钢WB36CN1配管组合焊接工艺分析 被引量:5

Analysis of combined welding technology of piping of nuclear power plant steel WB36CN1
下载PDF
导出
摘要 根据核电钢材WB36CN1性能及特点,通过分析该钢材在核电配管工程中的焊接要点和难点,研究设计了不同于传统"手工氩弧焊打底+焊条电弧焊"焊接方法的新焊接工艺——"手工氩弧焊+焊条电弧焊+埋弧自动焊"(GTAW+SMAW+SAW)组合焊接工艺。该工艺应用于WB36CN1工厂配管焊接工程,经100%UT+100%RT+100%MT三项检验及测试,焊缝全部一次合格率100%,为核电工厂配制WB36CN1管道提供了基础工艺数据。 The key points and difficulties in welding in nuclear power piping engineering were analyzed according to the properties and characteristics of nuclear power steel WB36CN1.A new combined welding process 'GTAW + SMAW + SAW' method which is different from the traditional(GTAW + SMAW) welding process was designed.The new process was applied to welding of WB36CN1 factory piping in engineering.All weld seams are tested by 100%UT,100%RT and 100%MT.and the qualified rate is 100%,which provides the basic process data for nuclear power plant in WB36CN1 pipe line processing.
出处 《焊接》 北大核心 2013年第12期29-32,70,共4页 Welding & Joining
基金 黄埔区科技计划资助项目(201341)
关键词 WB36CN1 核电配管埋弧自动焊组合焊接工艺 WB36CN1 nuclear power piping automatic submerged arc welding combined welding processes
  • 相关文献

参考文献6

二级参考文献6

  • 1赵彦芬,遆文新,汪小龙,薛飞.核电站用钢管材料及其国产化[J].钢管,2007,36(2):11-14. 被引量:27
  • 2Arming R. Stress corrosion cracking of pressure vessel steel[A]. Material problem in light water reactor: status, mitigation, future problem [ C ]. Suzhou, 2005 : 21-23.
  • 3AFCEN.RCC-M.压水堆核岛机械设备设计与制造规则[S].1993版.核工业第二研究设计院,译.1996.
  • 4Port R D. Flow accelerated corrosion[A]. Corrosion 1998[C]. paper No. 921.
  • 5DL/T 869-2004.火力发电厂焊接技术规程[S]..2004
  • 6DL/T 819-2002.火力发电厂焊接热处理技术规程[S]..2002

共引文献21

同被引文献22

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部