摘要
长山-红岗子段是珲春-乌兰浩特国家高速公路的一部分,本段主要围绕如何较多地、合理地利用原一级公路改建,并考虑避让文物保护区和减少对城镇干扰等因素进行方案比较,找出存在的问题。通过调查实际情况,考虑未来发展,提出科学处理方法,使项目在技术指标、安全设施、环境保护、概算等方面达到安全、经济、合理。
Changshan to Honggangzi section is a part of Hunchun - Wullanhaote national highway. This period mainly centre on the more and reasonable use of the original first - class highway reconstruction, and consider keep clear historic reservation and reduce disturb to town, find out the existing problems. By investigating the actual situation, think of the future development, scientific processing method is put forward, make the project in technical indicators, safety facilities, environmental protection and budget estimate achieve safe, economic and reasonable.
出处
《内蒙古公路与运输》
2013年第6期43-45,共3页
Highways & Transportation in Inner Mongolia
关键词
长山-红岗子段
互通立交
安全设施
概算
Changshan to Honggangzi section
interchange
safety facilities
budget estimate