地铁车站明挖施工深基坑监控量测及数值模拟研究 被引量:20

Monitoring and Numerical Simulation Research on the Deep Foundation Excavation in Open-cut Construction of Subway Station
下载PDF
导出
摘要 通过建立地下连续墙、内支撑和土层三维整体有限元模型,对深基坑开挖每步施工过程进行数值模拟分析。探讨深基坑随着施工推进土层的变形情况、内支撑的应力分布情况,进而判断深基坑在整个施工过程中的稳定性和安全性。同时还对深基坑开挖过程中对毗邻建筑物的地面变形和基坑支护应力进行了监测,并与数值模拟结果进行了对比。结果表明,理论计算结果和现场监测数据的变化规律基本一致,在深基坑施工过程中要重点控制由于开挖引起的地面过大变形和监控支护结构的内力。 The whole model of three-dimensional finite element is established through the diaphragm wall, inner supporting and soil layer. The numerical simulation of deep foundation excavation under the construction process is carried through. The deformation of soil in the deep foundation excavation with the construction process and stress distribution in the inner supporting are discussed. Then the stability and safety of deep foundation excavation in the whole construction process is judged. At the same time, the ground deformation on adjacent buildings and foundation excavation support stress is monitored in the deep foundation excavation, and the results are compared with the numerical simulation. The results show that the theoretical calculation results and monitoring data are basically the same. The ground deformation should be controlled and the internal force of support structure is monitored in the construction process of deep foundation excavation.
作者 郭余根
出处 《施工技术》 CAS 北大核心 2014年第1期78-82,共5页 Construction Technology
关键词 地下工程 地铁车站 深基坑 监测 数值模拟 变形 underground subway stations deep foundation excavation monitoring numericalsimulation deformation
  • 相关文献

参考文献8

二级参考文献58

共引文献690

同被引文献136

引证文献20

二级引证文献130

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部