针对宁波地区软土地层,结合宁波澄浪电力隧道的工程条件,系统地分析了明挖法与顶管法在该工程中的应用可行性和施工工法比选,可供类似工程施工方法的选择参考。
With regard to the soft soil in Ningbo,combined with the engineering condition of Ningbo Chenglang Power Tunnel,the article systematically analyzes and compares the cut and cover method and pipe jacking method and their application feasibility in that engineering. It will be a reference of construction method selection for similar project.