富水砂层中盾构端头加固体失效原因分析及防治 被引量:6

On analysis of reasons for solidifying agent failure at shield ends in water-rich sand
下载PDF
导出
摘要 通过国内已建和在建地铁采用非冻结法在饱和砂层中进行盾构端头井加固施工失效而引发盾构始发或到达失败的案例,从设计和施工两个方面进行原因分析,提出了预防措施,对今后在类似地层中采用非冻结法进行加固施工一次成功,避免重复加固,减少浪费、节约成本、保证工期,有一定的借鉴和参考意义。 According to the shield starting position or arrival failure caused by the failure of the shield end consolidation construction by adopting the non-freezing method at the built and constructing subways in China, the paper analyzes the reasons from the design and the construction, points out the prevention measures, so as to provide some reference for the success of the non-freezing method in the consolidation construction and to avoid the repeated consolidation, reduce cost, and ensure the construction period.
作者 刘根宁
出处 《山西建筑》 2014年第6期182-183,共2页 Shanxi Architecture
关键词 富水砂层 非冻结法施工 加固体失效 原因分析 预防措施 water-rich sand, non-freezing method construction, failure of solidifying agent, analysis of reasons, prevention measures
  • 相关文献

参考文献3

  • 1王晖,谭文,黄威然.广州地铁三号线北延段盾构隧道工程技术研究[M].北京:人民交通出版社,2012:8.
  • 2崔玖江,崔晓青.隧道与地下工程注浆技术[M].北京:中国建筑工业出版社,2010.
  • 3黄威然,杨书江.砂与砂砾地层盾构工程技术[M].北京:中国建筑工业出版社,2013:2.

共引文献12

同被引文献18

引证文献6

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部