摘要
结合工作实践,主要介绍了阳翼高速公路8合同段芦苇河大桥高墩施工工艺、控制方法,并对施工过程中应注意的问题做以说明,以供同类工程施工时参考。
Integrating with working practice, the article mainly introduces the high pier construction technology and control methods of Luwei river bridge of Yang-Yi highway 8th contract section, and illustrates the construction matters, with a view to provide some guidance for similar engineering.
出处
《山西建筑》
2014年第6期206-208,共3页
Shanxi Architecture
关键词
高墩
施工技术
立柱
盖梁
high pier, construction technology, upright, bent cap