摘要
就 40t/d盐酸生产合成炉至石墨冷却器间空气冷却管的设置、管径及管长进行了设计计算。经生产检验设计合理 。
For a 40t/d hydrochloric acid production system,a size of air cooling pipe between synthesis furnace and graphite cooler was calculated. The practical production has proved that the design was reasonable and the operation was stable.
出处
《海湖盐与化工》
2001年第1期1-3,共3页
Sea-Lake Salt and Chemical Industry
关键词
盐酸
生产
空气冷却管
设计
hydrochloric acid
production
air cooling
pipe
design