基于ISM的我国水电企业东南亚水电投资风险分析 被引量:8

An Analysis of Hydropower Investment Risks in Southeast Asia of China's Hydropower Enterprises Based on ISM
下载PDF
导出
摘要 近年来,我国水电开发企业在东南亚地区投资的水电项目越来越多,如何有效的识别、分析和防范东南亚地区的水电项目投资风险成为迫切需要研究的问题。从分析我国水电开发企业东南亚水电项目投资风险特征出发,运用风险分解结构RBS从宏观环境、企业层面和项目层面识别了东南亚水电投资的主要风险因素,并运用解释结构模型ISM分析了各风险因素之间的关系,划分了风险层次结构,确定了主要风险,为我国水电开发企业有效的管理和应对东南亚地区水电项目投资风险奠定基础。 In recent years,China's hydropower development enterprises invest more and more hydropower projects in Southeast Asia.How to identify,analyze,prevent and control investment risks is a problem to be studied.In this paper,the investment risk characteristics of hydropower projects in Southeast Asia are analyzed by using the Risk Breakdown Structure (RBS).The major risk factors of hydropower investment in Southeast Asia from the macroscopic environment,the enterprise level and project level are also analyzed In the end,Interpretative Structural Modeling (ISM) analyzes the relationship between the various risk factors,divides the risk hierarchy and find the main risks,this work has laid a foundation for risk management.
机构地区 河海大学商学院
出处 《中国农村水利水电》 北大核心 2014年第1期157-160,共4页 China Rural Water and Hydropower
基金 国家社会科学基金重大项目"中国与周边国家水资源合作开发机制研究"(11LZD168) 国际河流研究中心资助项目
关键词 东南亚 水电开发 投资风险 风险分析 southeast asia hydropower development investment risk risk analysis
  • 相关文献

参考文献8

  • 1国际河流组织.新的长城-中国海外建坝行动2013[R].北京:国际河流组织,2013:16-20.
  • 2克里斯.查普曼著.项目风险管理:过程、技术和洞察力[M].李兆玉等译.北京:电子工业出版社,2003:6l-62.
  • 3Cooper D F, Grey S, Raymond G, et al. Project risk management guidelines: managing risk in large projects and complex procure ments[M]. NcwYork: John Wiley ~ Sons, 2005 : 365-366.
  • 4邱苑华 沈建明 杨爱华.现代项目管理导论[M].北京:机械工业出版社,2002..
  • 5David Hillson. Use a risk breakdown structure(RBS) to under- stand your risks[C]//Proceedings of the Project Management In- stitute Annual Seminars l~ Symposium. San Antonio, Texas, USA, 2002, (10) :3-10.
  • 6杨文安,吴唤群,谢晓如.风险分解结构应用于BOT项目的风险管理[J].中南公路工程,2004,29(4):133-135. 被引量:4
  • 7王振强,钟登华.大型水利工程项目投资风险分析方法[J].水利学报,2004,35(7):92-97. 被引量:37
  • 8Mustafa MA, Al-Bahar JF. Project risk assessment using the an- alytic hierarchy process [J]. IEEE Transaction on Engineering Management. 1991,38(1) :46-52.

二级参考文献14

  • 1[1]Cooper DF,CHAPPMAN CB.Risk analysis for large projects-models,methods and cases[M].John Wiley Sons,New York,1987.
  • 2[2]Mustafa MA,Al-Bahar JF.Project risk assessment using the analytic hierarchy process [J].IEEE Transaction on Engineering Management.1991,38(1):46-52.
  • 3[3]Charoenngam C,Yeh C Y.Contractual risk and liability sharing in hydropower construction [J].International Journal of Project Management,1999,17(1):29-37.
  • 4[4]CHAPMAN CB, DALE F COOPER.Risk Engineering Basic Controlled Interval and Memory Models[J].J Opl Res Soc 1983,134(1):51-60.
  • 5[5]CHAPMAN CB.A risk engineering approach to project risk management [J].Intermational Journal of ,Project Management,1990,18(1):5-16.
  • 6[6]CHAPMAN CB.Large Engineering Project Risk Analysis[J].IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT,1983,V26(1):51-60.
  • 7李兆玉,等译.项目风险管理:过程、技术和洞察力[M].北京:电子工业出版社,2003.
  • 8Project Management Institute. A Guide to Project Body of Knowledge(PMBOK)[M],2000.
  • 9David Hillson.Use a Risk Breakdown Structure (RBS) to Understand Your Risks[A].Proceedings of the Project Management Institute Annual Seminars & Symposium[C].October 3~10,2002.San Antonio,Texas,USA.
  • 10张水波,孔德泉,何伯森.BOT项目风险管理的担保手段[J].中国软科学,2000(2):73-76. 被引量:21

共引文献51

同被引文献68

引证文献8

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部