摘要
新建大型火电机组引风机和增压风机"合二为一"模式的推广应用以及原有旧机组分设模式改造为合一模式的新情况,致使提高"二合一"后引风机的压力成为关键。本文着重论述现有电站锅炉轴流通风机提高压力的实用技术方法。
The promotion and application of the established "combined" mode of draft fan and booster fan for large-type thermal power and the new situations of dividing the original "combined" mode which improving pressure of draft unit into the has resulted in fan to be a key. This paper has specified the practical technique method for improving pressure boiler axial-flow fan for power plant.
出处
《风机技术》
2013年第6期58-60,共3页
Chinese Journal of Turbomachinery
关键词
电站锅炉
轴流通风机
增压方法
power plant boiler
axial-flow fan
boosting method