期刊文献+

某高层建筑物施工期抗浮设防水位的确定

Determination of the anti-floating waterlevel in the construction period of a certain high-rise building
下载PDF
导出
摘要 根据建筑物和地形特点,通过岩土工程勘察、水文地质勘察,分析论证了江西省赣州市某F栋高层建筑地下车库施工期的抗浮设防水位,确保在现有抗浮设防水位下工程安全、经济合理. Based on the characteristics of building and geomorphy and by geotechnical engineering investigation and hydrogeological investigation,the anti-floating waterlevel in the construction period of underground garage of a certain high-rise building in Ganzhou city of Jiangxi province is analyzed and demonstrated in order to ensure the project safe and reasonable in the present anti-floating waterlevel.
出处 《江西水利科技》 2013年第4期265-266,279,共3页 Jiangxi Hydraulic Science & Technology
关键词 高层建筑 施工期 抗浮设防水位 工程安全 经济合理 High-rise building Construction period Anti-floating waterlevel Project safety Reasonable
  • 相关文献

参考文献3

  • 1GB50021-2001.岩土工程勘察规范[S].[S].,2002..
  • 2JGJ 72-2004 高层建筑岩土工程勘察规范[S].
  • 3常士骠,张苏民.工程地质手册[M].北京:中国建筑工业出版社,2007.

共引文献952

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部