摘要
本文根据长龙水库溢洪道水工模型试验基础上提出了加固设计方案,既解决了溢洪道存在的问题,又节约了资金,取得了良好的经济效益.
Based on the hydraulic model experiment of the spillway of Changlong Reservoir,the reinforcement design scheme is proposed.It not only solve the existing problems of the spillway but also save the state funds.It achieved good economic benefits.
出处
《江西水利科技》
2013年第4期267-269,287,共4页
Jiangxi Hydraulic Science & Technology
关键词
长龙水库
溢洪道
水工模型试验
溢洪堰
陡槽
底板
边墙
设计
Changlong Reservoir
Spillway
Hydraulic model experiment
Effluent weir
Chute
Base plate
Abutment wall