摘要
本文分析了水利水电工程调整概算的主要原因,探讨其编制办法,提出"复核式调整概算"与"报账式调整概算"两种方法,并进行对比分析.与同仁交流.
The main reasons of budgetary estimation adjustment for hydraulic and hydroelectric projects is analyzed.The compilaition method is discussed.Two methods such as check adjustment of budgetary estimation and accounting adjustment of budgetary essimation are proposed and analyzed.It can be referred for the similar projects.
出处
《江西水利科技》
2013年第4期314-316,共3页
Jiangxi Hydraulic Science & Technology
关键词
江西
山西
水利水电工程
超概
复核式调整概算
报账式调整概算
Jiangxi province: Shanxi province
Budegetary overrun
Chack adjustment estimation
Accounting adjustment esti-mation