期刊文献+

丰满水电站重建工程水土保持方案设计 被引量:1

Design of soil and water conservation scheme for reconstruction project of Fengman hydropower station
下载PDF
导出
摘要 水电站重建工程中的生态环境问题较为突出,工程建设中搞好水土保持工作具有重要的意义。文章以丰满水电站重建工程为例,通过主体工程水土保持的分析评价以及有针对性的水土保持措施,阐述了基于水土保持的建设理念。 The ecological environment problem is prominent in the hydropower station reconstruction project,the work of the soil and water conservation has the important significance in the project construction. Taking the reconstruction project of Fengman hydropower station as an example, the paper introduces the construction idea based on the soil and water conservation through the analysis and assessment and the targeted measures of the soil and water conservation for the main project.
出处 《东北水利水电》 2014年第2期1-3,共3页 Water Resources & Hydropower of Northeast China
关键词 丰满水电站 重建工程 水土保持 方案设计 Fengman hydropower station reconstruction project soil and water conservation scheme design
  • 相关文献

参考文献3

  • 1张树华.丰满水电站全面治理工程水土保持方案报告书[R]长春:中水东北勘测设计研究有限责任公司,2010.
  • 2史有富.吉林丰满水电站全面治理(重建)工程施工组织设计报告[R]长春:中水东北勘测设计研究有限责任公司,2012.
  • 3方草.景观生态化设计理论在水电站开发中的应用初探[J].水电站设计,2009,25(1):88-91. 被引量:2

二级参考文献10

共引文献1

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部