摘要
文章以蒲石河抽水蓄能电站下水库为例,在分析流域水沙特性的基础上,结合工程特性分析提出"蓄清排浑"的排沙运行方案,通过泥沙冲淤数学模型计算分析,可达到良好的减淤效果。
Taking the lower reservoir of Pushihe pumped storage power station as an example, the paper puts forward the sediment releasing scheme of storing clear and releasing muddy based on fully analysis the basin water and sediment with the characteristics of the project, which achieve the good effect of sedimentation reduction by using the calculation and analysis of sedimentation mathematical model.
出处
《东北水利水电》
2014年第2期33-34,1,共2页
Water Resources & Hydropower of Northeast China
关键词
抽水蓄能电站
泥沙淤积
排沙运行
方案研究
pumped storage power station
sedimentation
sediment releasing operation
scheme study