梯级建设环境下水电工程施工导流风险分析 被引量:16

Risk analysis of hydropower construction diversion with cascaded reservoirs
原文传递
导出
摘要 梯级建设环境下水电工程施工导流系统风险受到上游梯级洪水蓄泄和下游梯级水库运行的影响。基于对上游已建梯级、区间洪水、支流汇入、上游在建梯级和下游在建梯级等主要组成部分的影响分析,计入上游水库调蓄、区间河槽调蓄作用,考虑天然洪水、上游梯级泄流能力、支流汇入洪水及其叠加方式、区间洪水、下游梯级回水和施工导流系统泄流能力等不确定性因素,按影响次序叠加得到施工洪水,以洪水下泄过程模拟为主要的因素耦合方式,建立梯级建设环境下水电工程施工导流风险测度模型,应用Monte-Carlo方法求解风险度。研究成果为金沙江下游白鹤滩电站施工导流标准决策提供了参考。 Risks in a construction and diversion system of hydropower project with cascaded reservoirs depend on the flood control of upstream reservoirs and downstream reservoir operation and environmental control. This paper develops a diversion risk evaluation model that simulates flood discharge process to couple the major factors, such as upstream water release, interval-basin flood, branch afflux, and construction of upstream and downstream stations, upstream reservoir regulation, river channel storage, and uncertainties in natural flood, upstream station discharge capacity, branch afflux and its superposition method, interval-basin flood, downstream reservoir backwater level, and construction diversion system. This model uses Monte-Carlo Method to evaluate diversion risk. The present study provides references for the decisions on the diversion standard of Baihetan project on the lower Jinsha River.
出处 《水力发电学报》 EI CSCD 北大核心 2014年第1期147-153,共7页 Journal of Hydroelectric Engineering
基金 国家自然科学基金(10902078 51379164 51079115)
关键词 水利工程施工 导流风险 风险测度模型 梯级水电站 construction of hydraulic project risk of construction diversion risk evaluation model cascade hydropower stations
  • 相关文献

参考文献4

二级参考文献29

  • 1史培军.环境风险管理及其应用[J].管理世界,1993,9(4):12-15. 被引量:3
  • 2姜树海,范子武.水库防洪预报调度的风险分析[J].水利学报,2004,35(11):102-107. 被引量:54
  • 3肖焕雄,孙志禹.不过水围堰超标洪水风险率计算[J].水利学报,1996,28(2):37-42. 被引量:15
  • 4穆荣平,任中保,王瑞祥.技术预见历史回顾与展望,中国科学院科学与技术预见系列报告之技术预见报告[M].北京:科学出版社,2005.
  • 5Office of Science and Technology. Foresight Future Flooding Scientific Summary Volume I : Future risks and their drivers [ R]. London, 2004.
  • 6Office of Science and Technology. Foresight Future Flooding Scientific Summary Volume II :Managing Future risks[ R]. London, 2004.
  • 7Evans E, Thome C, et al. Future flood risk management in the UK[J] .Water Management,2006,159(1):53- 61.
  • 8水利部太湖流域管理局防汛抗旱办公室.1991年太湖流域洪水[M].北京:中国水利水电出版社,2000.
  • 9Yen Ben Chie.Stochastic methods and reliability analysis in water resources[J].Water Resources Research,1988,24 (9):213-224.
  • 10Afshar A,Barkhordary A,Marino M A.Optimizing river diversion under hydraulic and hydrologic uncertainties[J].Journal of Water Resources Planning and Management,1994,120 (1):36-47.