摘要
在借鉴国内外平板载荷试验方法的基础上,研究适于我国路基检测的快速静态平板载荷试验方法,并通过对比试验得出地基系数K30、二次变形模量EV2与快速试验结果的相关关系,为完善我国铁路路基压实质量检测方法提供参考。
By reference to plate loading test methods at home and abroad, the fast static plate loading test method applicable to subgrade inspection in China was studied. Through the contrast test, the relationship between foundation coefficient K30, secondary modulus of deformation Ev2 and the test result was obtained, offering scientific basis or reference for the purpose of improving compaction quality detection method for railway subgrade in China.
出处
《路基工程》
2014年第1期73-75,共3页
Subgrade Engineering
基金
科技部科研院所技术开发研究专项资金:铁路路基施工质量快速检测方法研究(2012EG123039)